

With the exception of the placement of the take‑off board, the same facilities are used for triple jump as for long jump. The top edge of the border of the landing area, generally also dictates the level of the sand, which must be level with the take‑off board. The landing area has a water permeable substructure or a suitable drainage system (draining well or canal connection) and filled with sand to a depth of not less than 0.30m at the edges and slightly deeper at the centre. The landing area has a border not less than 0.05m wide and 0.30m high, rounded off towards the inside (eg wooden plank or concrete border with soft covering) and level with the ground. If two landing areas are situated parallel side by side or staggered, the distance between them is at least 0.30m. The landing area is placed so that the middle of the runway coincides with the middle of the landing area. Generally, a landing area 8m long placed 2m from the take‑off line is recommended. The landing area is 7‑9m long depending on the distance between its nearest end and the take‑off line. This makes it possible to combine the long and triple jump with two or three take‑off boards (which can be used on both sides) on a triple jump runway. If it has a track surface on its reverse side, it can be turned over and used as part of the runway.
Sc jummp program free#
During sport free periods, the take‑off board can be removed.

In the case of a runway with a permanent surface, this requires a built‑in installation tray made of corrosion protected metal in which the take‑off board is correctly positioned. The surface of the take‑off board must be flush with the surface of the runway. The take‑off board is a white rectangle and measures 1.22m ± 0.01m long and 0.20m ± 0.002m wide and not more than 0.10m deep.

The runway is usually covered with the same surface as the track. It is marked by white lines 0.05m wide or broken lines 0.05m wide, 0.10m long and 0.50m apart. The runway is 40m minimum long, 1.22m ± 0.01m wide and is measured from the beginning of the runway to the take‑off line. This allows competition in either direction by two groups of athletes simultaneously. Usually, it is placed outside the track along one of the straights with two adjacent runways with a landing area at each end. It does not store any personal data.The long jump facility includes a runway, a take‑off board and a landing area. The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. The cookie is used to store the user consent for the cookies in the category "Performance". This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. The cookies is used to store the user consent for the cookies in the category "Necessary". The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". The cookie is used to store the user consent for the cookies in the category "Analytics". Set by the GDPR Cookie Consent plugin, this cookie is used to record the user consent for the cookies in the "Advertisement" category. These cookies ensure basic functionalities and security features of the website, anonymously. Necessary cookies are absolutely essential for the website to function properly.
